Al Fahidi, Dubai · 2025
Heritage Building Restoration
Lighting a protected coral-stone building with almost nowhere to fix anything.
Reversible only
New fixings
First submission
Approval
Ground level
Source positions
9 months
Programme
The brief
Conservation rules permitted very few new fixings, and none visible in the daytime elevation.
Our approach
Almost all lighting works from ground level and from existing openings, using narrow beams across the coral stone to bring out its texture. Where fixings were unavoidable, they use existing mortar joints and are reversible without damage.
The outcome
Approved by the conservation authority at first submission — rare for a lighting scheme on a protected elevation.
| Location | Al Fahidi, Dubai |
| Completed | 2025 |
| Scope | Assessment, design, supply |
| Size | 1,200 m² |
| Sector | Architectural |
Gallery
The installed scheme
More architectural
All architectural
Related projects

Similar project?
Tell us what you are building
Most projects start with a plan and a conversation about how the space should feel. That is enough for us to be useful.