Al Ain, Abu Dhabi · 2025
Desert Resort Refurbishment
A twelve-year-old resort re-lit without closing, phased villa by villa.
68
Villas
0
Closure days
47%
Energy reduction
13 months
Programme
The brief
Failing halogen and early LED across sixty-eight villas, with no closure window available in a property running at high occupancy.
Our approach
A site assessment established which existing housings could be retained, allowing a retrofit path that avoided ceiling works in most rooms. Villas were re-lit in blocks of four during natural occupancy gaps.
The outcome
The property never dropped a key from sale. Energy use across the villas fell by just under half.
| Location | Al Ain, Abu Dhabi |
| Completed | 2025 |
| Scope | Assessment, design, supply |
| Size | 68 villas |
| Sector | Hospitality |
Gallery
The installed scheme

Similar project?
Tell us what you are building
Most projects start with a plan and a conversation about how the space should feel. That is enough for us to be useful.